A technique for performing quantitative analysis of progress is known as ?? A. BCWS B. EVA C. BAC D. CBSE View Answer B. EVA You Might Also Like The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as ?? November 28, 2021 A _______________ is developed using historical cost information that relates some software metric to the project cost ?? November 28, 2021 Who defines the business issues that often have significant influence on the project ?? November 26, 2021 What evaluates the risk associated with the technology to be implemented as part of project scope ?? November 26, 2021 Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?? November 28, 2021 PM-CMM stands for ?? November 27, 2021 Which of the following costs is not part of the total effort cost ?? November 26, 2021 Why is decomposition technique required ?? November 28, 2021 Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?? November 27, 2021 Who interacts with the software once it is released for production use ?? November 26, 2021 A project usually has a timeline chart which was developed by ?? November 26, 2021 Which of the following term is best defined by the statement: The underlying technology on which the system is built is superseded by new technology ?? November 27, 2021 Which of the following is a configuration item ?? November 26, 2021 The environment that supports the software project is called ?? November 26, 2021 Which one is not a risk management activity ?? November 26, 2021 What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?? November 26, 2021 Which of the following is not a sign that indicates that an information systems project is in jeopardy ?? November 27, 2021 Which of the following is a collection of project coordination technique ?? November 26, 2021 Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?? November 28, 2021 COCOMO stands for ?? November 26, 2021 Which of the following is not an effective project manager trait ?? November 26, 2021 COCOMO-II was developed at ?? November 26, 2021 Which risks are associated with the overall size of the software to be built or modified ?? November 28, 2021 Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems ?? November 27, 2021 Which of the following is a part of system release ?? November 27, 2021 Which of the following is incorrect activity for the configuration management of a software system ?? November 26, 2021 Which of the following are parameters involved in computing the total cost of software development project ?? November 26, 2021 Which of the following is the reason that software is delivered late ?? November 26, 2021 What all has to be identified as per risk identification ?? November 26, 2021 Who suggested the four different approaches to the sizing problem ?? November 27, 2021
The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as ?? November 28, 2021
A _______________ is developed using historical cost information that relates some software metric to the project cost ?? November 28, 2021
Who defines the business issues that often have significant influence on the project ?? November 26, 2021
What evaluates the risk associated with the technology to be implemented as part of project scope ?? November 26, 2021
Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?? November 28, 2021
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?? November 27, 2021
Which of the following term is best defined by the statement: The underlying technology on which the system is built is superseded by new technology ?? November 27, 2021
What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?? November 26, 2021
Which of the following is not a sign that indicates that an information systems project is in jeopardy ?? November 27, 2021
Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?? November 28, 2021
Which risks are associated with the overall size of the software to be built or modified ?? November 28, 2021
Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems ?? November 27, 2021
Which of the following is incorrect activity for the configuration management of a software system ?? November 26, 2021
Which of the following are parameters involved in computing the total cost of software development project ?? November 26, 2021